Our company signed the manufacture contract with Harbin Zhongxin Heavy Machinery Manufacturing Ltd. on Mar,2009.Both sides did large argument work for conclude the cooperation.
Firstly,customer did a survey in factory and evaluated the manufacture and produce capacity of steel construction product in our Co., considered that absolutely meet the requirement at last.
Secondly, customer provided the strict requirement of quality and technology about restrained beam, asked to complete manufacturing work on superior quality and quantity in stipulated period and offered the relevant drawing and technology agreement.Our technicians provided the proper insulation to customer`s technology requirement according to the product manufacturing and producing capacity, considered manufacturing capacity to meet customer`s requirement.
Signed the manufacture contract about restrained beam and stipulated to delivery goods before May,24,2009 by the discussion and confirmation of two sides at last.
Put the restrained beam into produce Now. Every department lie the work in work emphase. Manufacture the restrained beam and ensure delivery goods on time according to the manufacture period in the opinion “superior quality,high efficiency”.